Based on NEC 2023 Article 220 Part IV — Optional Method. Select every load in your home, then manage loads you don't need to run simultaneously.
⚠ Estimates only — verify all loads with nameplate data. Contact ReNew for a certified load assessment.
NEC 2023 Article 220 Part IV — Optional Method
Enter your conditioned square footage. The tool calculates general lighting at 3 VA/sq ft plus 4 small appliance circuits (6,000 VA) and one laundry circuit (1,500 VA).
Enable each appliance present in your home. For appliances with a gas/electric choice, select the fuel type — gas appliances draw minimal electricity and are not counted. Use quantity selectors for refrigerators/freezers. If you have a range (combined unit), select Range only — do not also select Cooktop and Oven separately.
Enable each A/C unit and select its tonnage (1,000 VA per ton). If you have electric heat (heat pump with backup strips), enable that unit's heat and select the strip size in kW — check your air handler nameplate for the heater kW rating. Gas heat draws only ~500 VA for the furnace controls/blower.
Per NEC 220 Part IV Optional Method:
Select ALL loads in your home, then manage all loads you don't want included in the generator size. Managed loads are automatically shed by Generac Smart Management Modules (SMMs) when the generator reaches capacity, then reconnected when load drops. Typical managed loads: electric water heater, secondary A/C units, dryer, EV charger, pool pump.
The results show two recommendations — one for full load and one after removing managed loads.
We'll review your load calculation and follow up with a recommendation and quote.
We respond within one business day · info@renewcontractors.net
Generates: lighting (3 VA/sqft) + 4 small appliance circuits (6,000 VA) + laundry circuit (1,500 VA)
Results based on NEC 2023 Art. 220 Part IV. Verify all loads with nameplate data. Contact ReNew for a certified load assessment.
Make your generator project more affordable with special financing through the Synchrony Project Card. Subject to credit approval.
*Subject to credit approval. Minimum monthly payments required.
Our team performs certified load assessments at no charge and handles everything from sizing to installation.